Steps for floating installation
| |
 |
|
 |
| 1. |
| - |
|
Lay out 4 to 5 rows of planks ahead of time that match in terms of joints and color.
|
| - |
|
Cut out imperfections planks or place them in less visible areas.
|
|
2.
|
| - |
|
Lay a 6-mil polyfilm underlayment with 8” overlapping seams.
|
| - |
|
Fasten every seams every 18” to 24” with duct tape or poly tape.
|
| - |
|
Run 4” polyfilm up again the perimeter of wall. |
|
| |
|
|
|
| |
 |
|
 |
| 3. |
| - |
|
Use chalk line to trace starting line with ½” expansion joint at the side and ¼” at row end.
|
| - |
|
Place expansion spacer at every 12” along all walls to prevent movement during installation.
|
|
|
| - |
|
Install 1st plank along the starting line with the tongue facing out
|
|
| |
|
|
|
| |
 |
|
 |
| 5. |
| - |
|
Install from left to right.
|
| - |
|
Apply PVAc adhesive to upper side of groove. Do not apply adhesive to tongue.
|
|
|
| - |
|
Use pull bar to tighten end joint and knocking block for the side.
|
|
| |
|
|
|
| |
 |
|
 |
| 7. |
| - |
|
Start subsequent row using the remainder of the cut-off end plank from previous row.
|
| - |
|
The remainder plank must be at least 6” in length. |
|
|
| - |
|
Once the entire surface is covered, remove expansion spacer and install molding to cover the expansion joint.
|
|
| |
|
|
|
| |
 |
| 9. |
- Completed installation with molding. |
Important: During installation, immediately wipe off any adhesive from the floor surface using towels or flooring cleaner available at the local stores. Use paint thinner if adhesive persists.
|